by Comit Developers | Feb 7, 2023
SCOPE OF WORK INCLUDED: DESIGN OF VACUUM PAN SYSTEM ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN FABRICATION OF STRUCTURAL STEEL 135 TONS FABRICATION OF (2) 2,800 CF BATCH VACUUM PANS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; (2) MIXING RECEIVERS (148...
by Comit Developers | Feb 7, 2023
TOTAL OF 2,725 LF OF 6” SCH 40 316LSS PIPING300 LF OF UNDERGROUND 6” SCH 40 316LSS PIPING245 WELDS; ALL WELDS WITH INCONEL 625 GTAW; 100% RT65 CONCRETE PIPE SUPPORT...
by Comit Developers | Feb 7, 2023
SCOPE OF WORK INCLUDED: DESIGN OF EVAPORATION SYSTEM ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN FABRICATION OF STRUCTURAL STEEL 150 TONS FABRICATION OF (3) 17,000 SF EVAPORATORS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; 148 TONS INSTALLATION OF...
by Comit Developers | Feb 7, 2023
SCOPE OF WORK: 4,000,000 GALLONS OF STORAGE TANK CAPACITYSITE PREPERATIONFOUNDATIONSTANK DESIGN AND CONSTRUCTIONALL FEED AND DISCHARGE PIPING120’-0” DIA X 24’-0” TALL (EACH TANK)CAPACITY : 2,000,000 GALLONS PER TANKAPPROXIMATELY 750 TONS OF...
by Comit Developers | Feb 7, 2023
516 1.5” O.D. TUBESSHELL THICKNESS 1.5”MATERIALS USED: SA516-70N, SB443-625(INCONEL), SA240-2205, SA268-TP405SSWEIGHT 25...